Moving in

Move in without a leap of faith.

Start with the modules you need beside your current setup, with nothing to migrate. When you make Microdoc the system of record, the move is a managed project that we run and you sign off.

Send the export today and review a complete, verified copy of your practice tomorrow morning. The processing runs overnight, typically in 1 to 12 hours, while the clinic is closed.

Plan the move
Your move to Microdoc Example move · Tuesday 08:40
Export received from your current system Mon 17:05
12,384 patients mapped and deduplicated Mon 22:41
Test build of your practice ready Tue 06:12
Your team reviews the test build Your part
Go-live Sign-off first

Nothing switches until you sign off.

Two ways to start

A migration is optional. Momentum is not.

Start alongside

Add modules beside your current setup.

Phone, patient messaging, and ambient documentation work from day one without touching your existing records. The practice feels the relief first and decides the pace.

No data migration required.

Move in fully

Make Microdoc the system of record.

Patients, diary, documents, and billing move into one place. The move is an overnight build you review the next morning, verified before you open.

Send the export today; open in Microdoc tomorrow.

The move, hour by hour

We do the work. You check it twice.

Send the export at the end of one clinic day and review your practice in Microdoc the next morning. Your part is an export, a question list, and a review pass; everything else runs overnight.

Today 17:00

You: ~1 hour

You send the export

One export from your current system, sent at the end of the clinic day. Mapping starts the moment it arrives, and anything ambiguous comes back as a short question list.

Your part

Run one export and answer a short question list.

Our part

Mapping, deduplication, and cleanup begin immediately.

Overnight

You: nothing

We map, build, and verify

Every patient, appointment, document, and balance is mapped to its Microdoc home and a complete copy of your practice is built. Processing typically takes 1 to 12 hours, and record counts are verified against the export before morning.

Your part

Nothing. This runs while the clinic is closed.

Our part

The full build, plus count-by-count verification.

Tomorrow 08:00

You: a review pass

Your team checks the copy

Reception, secretaries, and doctors open the build and look up real patients, letters, and balances. Nothing is live; anything that looks off goes back into mapping and is re-run the same morning.

Your part

Click around the copy and flag anything off.

Our part

Fix every flag and re-verify within the morning.

Go-live

On your sign-off

You sign off, and the practice opens

On sign-off We refresh to the latest export and re-verify the counts.
Minutes later The practice opens in Microdoc.

Your part

Approve the switch. It never happens without your sign-off.

Our part

The final refresh and the re-verification.

What comes across

Your history arrives with its patients.

The mapping stage produces a manifest like this one for your practice. Every line is verified against the export before your review, and templates are rebuilt with you so letters leave looking the way you want them to.

Data manifest Example move · Verified
Patients and contact details 12,384 Comes across
Appointments, past and future 148,201 Comes across
Documents and letters 63,090 Comes across
Outstanding balances €48,310 Comes across
Recalls and waitlists 312 Comes across
Letter and report templates 41 Rebuilt with you

Counts are checked against the export, number for number.

The safety rails

Designed to make go-live boring.

The heavy lifting runs overnight

Processing typically takes 1 to 12 hours and runs while the clinic is closed. No clinic day is interrupted, and no patient notices.

Your current system stays untouched

We only ever work from exports. You keep access to the old system for reference after the move.

Counts are verified before you open

Patients, appointments, documents, and balances are checked against the export before your review, and again before you open.

Go-live is your sign-off

The switch happens when you approve the test build, not when a project plan says so.

Questions

Asked on every move.

Plan the move with us.

Bring whatever you run today. We'll map the path from first module to system of record around your clinic.

Book a demo